• Translations
  • Traduction
  • Übersetzungen
  • Traducción
  • Tłumaczenia
  Forgotten password?


Job (translation) #7329: Instrukcja obsługi    Urgent! [Frozen]

English Polish

Approximate size of the job: pages: 25
Started: 09 May 2008 @13:21 (GMT)
Job deadline: 12 May 2008 @13:00 (GMT)
Quoting deadline: 10 May 2008 @13:21 (GMT) ( expired )
Started by: Poland Langras s.c. - Biuro Tłumaczeń Rating: 3Number of ratings: 2
Job type: Translation
Expertise (general): Technical/Engineering
Translation job description: Instrukcja obsługi maszyny do piaskowania.
Sample text: HOISTING AND HANDLING THE MACHINE
The machine should be hoisted by means of a suitable crane, securing strong steel ropes or chains to the eye bolts (A, fig. 1) located on the top part of the machine.
Gently lift the load and lay it onto two wooden planks placed on the rollers. Caution should be used when the machine is being "wheeled" to the place of installation.
The machine can then be placed in the position best suited to its working requirements with the aid of a fork lift truck by inserting the fork under the machine base. Run strong ropes through the two eye bolts and fasten the ropes to the uprights of lift truck to prevent the machine from overturning while it is being handled.
Bids: 20There are 767 translators at GlobTra.com matching the criteria
Email to a friend

   
Report to moderator
job views: 212

Directory of translators: English translation, Polish translation, Translation: English-Polish
 

Directory of translators | Post a job/Get quotes | Privacy policy | Terms | Tell-A-Friend | Bookmark This Site! | See an error? Let us know!
Copyright (c) 2001-2007 GlobTra.com - Translation jobs, All rights reserved.